BuzzIndiaNow.com
  • Home
  • Latest News
  • World
  • Editorials
  • India
  • Cities
  • Technology
  • Sports
  • Entertainment
  • Education
  • Blog
  • More
    • Astrology

Subscribe to Updates

Get the latest creative news from FooBar about art, design and business.

What's Hot

Rohit Sharma: Virat-Rohit or Rohit-Yashasvi? – Matthew Hayden has a suggestion for India openers at T20 World Cup | Cricket News

May 10, 2024

Bengaluru woman arrested for alleged murder of transgender live-in partner: Report | Bengaluru

May 10, 2024

End of Rahul Dravid era? BCCI to search for new head coach after T20 World Cup | Cricket News

May 10, 2024
Facebook X (Twitter) Instagram
Facebook X (Twitter) Instagram
BuzzIndiaNow.com
Friday, August 14
  • Home
  • Latest News
  • World
  • Editorials
  • India
  • Cities
  • Technology
  • Sports
  • Entertainment
  • Education
  • Blog
  • More
    • Astrology
BuzzIndiaNow.com
Home»Latest News»Umiam Dam and Bridge Repair – Present Status
Latest News

Umiam Dam and Bridge Repair – Present Status

April 24, 202402 Mins Read
Facebook Twitter Pinterest LinkedIn Tumblr WhatsApp Reddit Email
Umiam Dam and Bridge Repair – Present Status
Share
Facebook Twitter LinkedIn Pinterest Email

“Works likely to be complete by June 2024”

“Govt. contemplates load restriction of 12 MT for the safety of the structure”

SHILLONG, APR 24: The Umiam Dam and Bridge was constructed in the year 1958 and completed in the year 1965. During these years, the bridge has been subjected to constant traffic movement. Due to the repetitive and successive loading it has led to deterioration in the bridge due fatigue.

The present works are being taken up under Dam Rehabilitation Improvement Project (DRIP). The main objective of DRIP are rehabilitation and improvement of dams and associated appurtenances safety institutional strengthening. The major works under DRIP includes Drilling and Grouting of Dam, Crack repairing and Hydromechanical works.

Advertisement

Present Status:
Rehabilitation of the Umiam Dam: At present 60% of the drilling and grouting works have been completed and as per preliminary reports, it was observed that seepage through the dam has reduced. The work is tentatively scheduled to be completed by 30th June 2024, after which the road will be opened fully for traffic.

Refurbishment of Bearings of the Bridge: Based of the technical report submitted by IIT, Guwahati and the in-situ technical assessment of the structure, the bridge bearings were refurbished by lifting the decking bridge. After refurbishment, the bridge has again been brought back to its original position.

Retrofitting of the Bridge: Besides IIT Guwahati Report, investigation on retrofitting of the bridge girder and deck slab is also being taken up with Central Soil & Material Research Station (CSMRS) for preparation of detailed report and estimate. After submission of the report further suitable action would be taken.

Load Restrictions:
• Till 30th June 2024: Vehicles up to 4MT only.
• After 30th June 2024: Vehicles up to 12 MT only to ensure long term safety and structural stability of the bridge.

Also Read: Tura Super Division Football League: Selsella SA and BOCA Juniors share spoils in a 2-2 goal match

Also Watch

Find latest news from every corner of Northeast India at hubnetwork.in, your online source for breaking news, video coverage.

Also, Follow us on-

Twitter-twitter.com/nemediahub

Youtube channel- www.youtube.com/@NortheastMediaHub2020

Instagram- www.instagram.com/ne_media_hub


Credit: Source link

Share. Facebook Twitter Pinterest LinkedIn Tumblr Email

Related Posts

Ambassador of France visits sacred grove and Mawphlang Dam, appreciates the bio diversity preservation techniques

May 10, 2024

Tynsong says law will take its own course

May 10, 2024

Tynsong says, Govt to appoint the right person as new Meghalaya DGP

May 10, 2024
Add A Comment

Leave A Reply Cancel Reply

Stay In Touch
  • Facebook
  • Twitter
  • Pinterest
  • Instagram
  • YouTube
  • Vimeo
Top Posts

Rohit Sharma: Virat-Rohit or Rohit-Yashasvi? – Matthew Hayden has a suggestion for India openers at T20 World Cup | Cricket News

May 10, 2024

Bengaluru woman arrested for alleged murder of transgender live-in partner: Report | Bengaluru

May 10, 2024

End of Rahul Dravid era? BCCI to search for new head coach after T20 World Cup | Cricket News

May 10, 2024

Earthquake of magnitude 4.5 strikes Afghanistan

May 10, 2024

HC closes Amritpal’s plea for temporary release after Punjab facilitated him in filing nomination for LS Polls | India News

May 10, 2024
Facebook X (Twitter) Instagram LinkedIn
  • Contact Us
  • Privacy Policy
  • Terms of Use
  • DMCA
© 2026 BuzzIndiaNow.com - All Rights Reserved!

Type above and press Enter to search. Press Esc to cancel.