BuzzIndiaNow.com
  • Home
  • Latest News
  • World
  • Editorials
  • India
  • Cities
  • Technology
  • Sports
  • Entertainment
  • Education
  • Blog
  • More
    • Astrology

Subscribe to Updates

Get the latest creative news from FooBar about art, design and business.

What's Hot

Rohit Sharma: Virat-Rohit or Rohit-Yashasvi? – Matthew Hayden has a suggestion for India openers at T20 World Cup | Cricket News

May 10, 2024

Bengaluru woman arrested for alleged murder of transgender live-in partner: Report | Bengaluru

May 10, 2024

End of Rahul Dravid era? BCCI to search for new head coach after T20 World Cup | Cricket News

May 10, 2024
Facebook X (Twitter) Instagram
Facebook X (Twitter) Instagram
BuzzIndiaNow.com
Wednesday, June 17
  • Home
  • Latest News
  • World
  • Editorials
  • India
  • Cities
  • Technology
  • Sports
  • Entertainment
  • Education
  • Blog
  • More
    • Astrology
BuzzIndiaNow.com
Home»Cities»To meet increasing power demand, discoms chalk plans for uninterrupted supply
Cities

To meet increasing power demand, discoms chalk plans for uninterrupted supply

April 19, 202402 Mins Read
Facebook Twitter Pinterest LinkedIn Tumblr WhatsApp Reddit Email
To meet increasing power demand, discoms chalk plans for uninterrupted supply
Share
Facebook Twitter LinkedIn Pinterest Email

To cope with the rising demand for electricity during the summer season, officials of Maharashtra State Electricity Distribution Company Limited (MSEDCL) and Maharashtra State Electricity Transmission Company Limited (MSETCL) have decided to shift supply from certain areas to others and lay new lines.

Rajendra Pawar, chief engineer from MSEDCL, and Anil Kolap of MSETCL conducted a meeting at Rasta Peth office on Thursday to review the transmission and distribution systems in Pune circle, divided into 12 divisions. (REPRESENTATIVE PHOTO)

The demand for electricity in Pune circle is around 3,100 MW. However, in the past two to three days, there’s been a significant heatwave, leading to a sharp increase in demand and some of MSETCL’s high-pressure substations and power lines facing the strain.

HT launches Crick-it, a one stop destination to catch Cricket, anytime, anywhere. Explore now!

Rajendra Pawar, chief engineer from MSEDCL, and Anil Kolap of MSETCL conducted a meeting at Rasta Peth office on Thursday to review the transmission and distribution systems in Pune circle, divided into 12 divisions.

MSEDCL officials said, “Considering the situation, we have decided to shift the load of Kathapur and Alephata 22 KV power lines from MSETCL’s Lonikand 400 KV substation to Bableshwar 400 KV substation to ensure smooth supply in the Pune region. By doing this, the power load on Lonikand will decrease, benefiting other consumers, especially agricultural pumps in Manchar division. Additionally, Chakan and Talegaon ultra-high-pressure power lines will see improvement. Moreover, some power load from the NCL 132 KV substation at Ganeshkhind is being redirected to 220 KV substations. Also, powerlines serving Talegaon, Kamshet, and Pavana in Rajgurunagar division will be supplied from Khopoli.”

Officials also proposed to commission new 22 KiloWatt (KW) power lines of MSETCL at various sub-stations of MSETCL.

News / Cities / Pune / To meet increasing power demand, discoms chalk plans for uninterrupted supply

Credit: Source link

Share. Facebook Twitter Pinterest LinkedIn Tumblr Email

Related Posts

Bengaluru woman arrested for alleged murder of transgender live-in partner: Report | Bengaluru

May 10, 2024

Prajwal Revanna case: BJP leader Devaraje Gowda arrested | Latest News India

May 10, 2024

Haryana: Congress seeks dismissal of BJP govt, fresh polls under President rule

May 10, 2024
Add A Comment

Leave A Reply Cancel Reply

Stay In Touch
  • Facebook
  • Twitter
  • Pinterest
  • Instagram
  • YouTube
  • Vimeo
Top Posts

Rohit Sharma: Virat-Rohit or Rohit-Yashasvi? – Matthew Hayden has a suggestion for India openers at T20 World Cup | Cricket News

May 10, 2024

Bengaluru woman arrested for alleged murder of transgender live-in partner: Report | Bengaluru

May 10, 2024

End of Rahul Dravid era? BCCI to search for new head coach after T20 World Cup | Cricket News

May 10, 2024

Earthquake of magnitude 4.5 strikes Afghanistan

May 10, 2024

HC closes Amritpal’s plea for temporary release after Punjab facilitated him in filing nomination for LS Polls | India News

May 10, 2024
Facebook X (Twitter) Instagram LinkedIn
  • Contact Us
  • Privacy Policy
  • Terms of Use
  • DMCA
© 2026 BuzzIndiaNow.com - All Rights Reserved!

Type above and press Enter to search. Press Esc to cancel.